Menu

Hotel on 5 Kungu Street

Hotel on 5 Kungu Street

The project envisages the installation of 50 piles (D = 420, L = 18) using the Double-rotary technology and driving the piles into the 500 mm deep base layer – dolomite. The piling will be carried out using Bauer BG284