New Hanza City
The project provides construction of sustaining wall consisting of D=620, 880 mm piles and construction of D=620 mm pile foundation 30 m below the ground using the most advanced Bauer drilling machines – BG28 and BG30.
The project provides construction of sustaining wall consisting of D=620, 880 mm piles and construction of D=620 mm pile foundation 30 m below the ground using the most advanced Bauer drilling machines – BG28 and BG30.