Menu

Ģenerāļa Radziņa and 11. novembra Embankments

Intersection of Ģenerāļa Radziņa Embankment, 11. novembra Embankment and 13. janvāra Street in Riga

Reconstruction of the related infrastructure at the intersection of Ģenerāļa Radziņa Embankment, 11. novembra Embankment and 13. janvāra Street in Riga. Construction of piles for the pedestrian and cyclist bridge and ramp, and test pile load testing.

Types of piles constructed on the site: Kelly-Casing, diameter 880 mm, length 15.2-17.0 m, number of constructed piles 17 pcs; FoW (double rotary), diameter 410 mm, length 11 m, number of constructed piles 32 pcs.