Menu

Pauls Stradiņš Clinical University Hospital

Pauls Stradiņš Clinical University Hospital

New construction of Building A in the 2nd phase of Pauls Stradiņš Clinical University Hospital. Construction of retaining walls and CFA pile foundations. Load testing of CFA test piles.

Types of piles constructed on the site: FoW (double rotary) wall piles, diameter 610 mm, length 9-10 m, number of constructed piles 344 pcs; CFA bored piles for foundations, diameter 450 mm, average length 12.9 m, number of constructed piles 94 pcs.

Client: SIA “Velve”.